Product Details:
Payment & Shipping Terms:
|
Material: | Carbon Steel, Stainless Steel, Aluminum Alloy, Brass, Etc. | Surface Treatment: | Blank |
---|---|---|---|
Service: | Customized | Application: | Blank |
Quality Control: | 100% Inspection | Shipping: | According To Customer's Requirement |
High Light: | lost wax casting aluminum,anti rust stainless steel lost wax casting,aluminum precision parts |
Precision Parts Manufacture Lost Wax Investment Casting Parts
Specifiction
Brand Name | Certification |
Place of Origin
|
Minimum Order Quantity | Price | Payment Terms |
Honevice | ISO9001 | Chengdu | 10 Piece/Pieces | US $0.5 - 99 / Piece | T/T |
Supply Ability | Delivery Time | Packaging Details | |||
20000 Piece/Pieces per Month | 2-4 weeks | Carton+Crate |
Processing Steps
Drawing→ Mold → Wax injection→ wax tree assembling→ Shell moulding→ Dewax-buring→ pouring→ Shell removing→ Cuttiing-Griding→ Machining → Deburring → Surface Finishing → Assembly → Quality Inspection→ Packing
Product Details
About us:
Our Business:
We are focus on CNC machining and Investment casting of lost wax. Business includes lost wax precision casting machining, forging machining, die casting machining, bar, tube, plate machining, etc.
How to guarantee the delivery time required by customers?
In order to ensure timely delivery, the following measures are formulated:
1. Organizational measures
Implement specific tasks and responsibilities of progress control personnel at all levels. Conduct follow-up research and analysis, firmly grasp the initiative of production, timely check the causes and formulate remedial measures for those who have not completed the production plan. Strengthen plan management and establish regular production meeting. Implement the total production cycle, constantly check the implementation of each node process period against the plan, timely adjust and dynamically control to ensure the realization of the total planned construction period.
2. Technical measures
According to the delivery time control, work out the operation plan weekly. Check the implementation of the plan every day and adjust it in time. The maintenance and repair of equipment shall be continuously strengthened in use to ensure the integrity of the equipment, so as to ensure and improve the utilization rate of the equipment, so as to avoid the failure or shortage of mechanical equipment affecting the progress of the project. Strengthen the technical management, review the drawings before each process, and carry out detailed technical disclosure. In the production process, the quality of each process shall be tracked and checked. If any quality problem is found, it shall be rectified in time to avoid affecting the next process. Strengthen the quality management, strictly carry out quality control according to the quality assurance measures, ensure the quality of each process is qualified, and put an end to the delay of construction period caused by rework and shutdown caused by product quality.
3. Information management measures
In the process of production and installation, collect relevant data of actual progress, sort out statistics, compare with planned progress, and provide comparison report to customers regularly. Under its control, the weekly operation plan shall be prepared, the progress record shall be made, the progress statistical table shall be filled in, the relations among all aspects shall be coordinated, the measures shall be taken timely, flexibly, accurately and decisively, all kinds of contradictions shall be eliminated, all weak links shall be strengthened, the dynamic balance shall be realized, and the delivery target shall be guaranteed.
Contact Person: Mr. Fred Lee
Tel: +8618280028662